by hadimarashy | Apr 14, 2021 | Case Studies, Concrete Cutting Case Studies
Client : Thames Tideway Tunnel/(BAM Morgan Balfour) BMB JV Programme : 12 weeks Value : £75k Download Case Study OVERVIEW As part of the Thames Tideway Tunnel project, Hammersmith Pumping Station is an existing Thames Water site in a residential part of west London....
by hadimarashy | Apr 13, 2021 | Case Studies, Concrete Cutting Case Studies
Client : Henderson and Taylor Programme : 2 weeks Value : £200k Download Case Study OVERVIEW The soft strip and demolition of Stanford-le-Hope’s ticket office and cube, in readiness for the construction of a new ticket office and gate structure. Demolition of both...
by hadimarashy | Apr 13, 2021 | Case Studies, Concrete Cutting Case Studies
Client : Peel Ports Programme : 8 weeks Value : £130k Download Case Study OVERVIEW The harbour is strategically located to serve the Oil and Gas fields of the southern North Sea and the planned Offshore Wind development off the UK East Coast. Great Yarmouth harbour...
by hadimarashy | Apr 12, 2021 | Case Studies, Concrete Cutting Case Studies
Client : Transport For London Value : £170k Download Case Study Costain Laing O’Rourke JV were awarded a £130 million construction contract to redevelop London Underground’s Bond Street tube station. John F Hunt carried out diamond drilling and wire sawing operations...