Case Studies

Client : Costain Skanska JV Programme : 38 weeks Value : Confidential Download Case Study OVERVIEW HS2 is building a
Client : Primark / Scudder Demolition Programme : 10 months Value : £300k Download Case Study OVERVIEW One of Birmingham’s
Client : Thames Tideway Tunnel / CVB Joint Venture Programme : 6 months Value : £350k Download Case Study OVERVIEW
Client : Thames Tideway Tunnel / FLO (Ferrovial Laing O’Rourke) JV Programme : 5 months Value : £140k Download Case
Client : RMS Programme : 12 weeks Value : £125k Download Case Study OVERVIEW Careys were awarded a design and
Client : Wates Programme : 24 months Value : £4.3m Download Case Study OVERVIEW The Ransome’s Wharf / Elcho Street
Client : Babcock / Defence Estates Programme : 15 weeks Value : £250k Download Case Study OVERVIEW A Second World
Client : R&F Properties Programme : 44 weeks Value : £10.5m Download Case Study OVERVIEW We demolished six structures and
Client : J F Finnegan Programme : 11 weeks Value : £230k Download Case Study OVERVIEW The overall scheme at
Client : Interserve Programme : 6 months Value : £150k Download Case Study OVERVIEW The construction of a passenger transfer
Client : Manhattan Loft Corporation Programme : 2 years Value : £160k Download Case Study OVERVIEW The London property developer,
Client : D.P. World Programme : 26 weeks Value : £570k Download Case Study OVERVIEW London Gateway is a unique
Client : Peel Ports Programme : 8 weeks Value : £130k Download Case Study OVERVIEW The harbour is strategically located
Client : Little Lion Ltd / Greenway Associates Programme : 10 weeks Value : £500k Download Case Study OVERVIEW The
Client : Hutchinson Property Group Ltd Programme : 12 weeks Value : £123k Download Case Study OVERVIEW Demolition of two