Case Studies

John F Hunt support enabling works demolition for TFL’s £1.5 billion Project
Barking Riverside Extension enabling works demolition is part of a ½ billion pound infrastructure project in order to provide transport
Read more.
The Fruit and Wool Exchange, London
Client : Exemplar Properties Value : £9 M Download Case Study Overview Duration: 74 weeks Existing Structure & Location: The
Read more.
Strand East, Stratford
Client : Vastint UK Value : £21 M Download Case Study Overview As Principal Contractor John F Hunt is currently
Read more.
The Stage, Shoreditch, London EC2
Client : Galliard Homes Value : £2 M Download Case Study Overview Duration: 24 Weeks This substantial one hectare site
Read more.
145 City Road, London EC1
Client : Rocket Investments Value : £17 M Download Case Study Project in progress: The old 1980’s built Crown House
Read more.
Young Street, London W8 5EH
Client : Grainger PLC Value : £1.3 M Download Case Study Overview: Duration: 32 weeks The site was previously an
Read more.
Bradwell Nuclear Power Station
Client : Vinci Construction UK Value : £9.4 M Overview: Bradwell, located in the South East of England, covers an
Read more.
Centre Point, London
Client : Almacantar Value : £11.75 M Download Case Study Overview Duration: 75 weeks The redevelopment of Centre Point is
Read more.
10 Fenchurch Avenue, London EC3M
Client : Saxon Land Value : £4.8 M Download Case Study Overview Duration: 42 weeks The Fenchurch Avenue project is
Read more.
80 Fenchurch Street, London EC3M
Client : Marick Value : £2.3 M Download Case Study Overview Duration: 36 Weeks Located along the densely pedestrianised area
Read more.
Silverton Mill, Exeter – Remediation
Client : D S Smith Value : £4.5 Million Download Case Study As Principal Contractor John F Hunt was contracted
Read more.
Silverton Mill, Exeter – River Redirection
Client : D S Smith Value : £4.5 M Download Case Study As Principal Contractor John F Hunt was required
Read more.
Crossrail – Liverpool Street, London EC2
Client : Crossrail Value : £6.3 M Download Case Study Overview Duration: 18 Months The Liverpool Street Crossrail project was
Read more.
Berners Street, London, W1T 3AB
Client : Derwent London Value : £2.8 M Download Case Study Overview Duration: 34 Weeks Three properties within Berners Street,
Read more.
65 – 67 Scrutton Street, London EC2
Client : Gansevoort Hotel Group Value : £2.55 M Download Case Study Overview: 67, Scrutton Street was a three story
Read more.