Client : Babcock / Defence EstatesProgramme : 15 weeksValue : £250k Download Case Study OVERVIEW A Second World War Lancaster bomber hangar measuring 100m long by 50m wide & 15m high, scheduled for demolition to make way for the development of a new...
Heathrow Terminal 4
Client : BAA / Taylor Woodrow Value : £1.8m Download Case Study Overview The existing canopy roof construction was 50mm thick paving slabs with high density foam insulation, mastic asphalt waterproofing and concrete Holorib type slab....
Willesden Euro Terminal HS2
Client : Costain Skanska JV Programme : 38 weeks Value : Confidential Download Case Study OVERVIEW HS2 is building a new high speed railway to link people across Britain, with over 25 stations connecting 30 million people and is one of the most demanding and...
Gatwick Hangar 5 & PL 7 Building
Client : BAA Gatwick / Taylor Woodrow Programme : 18 weeks Value : £250,000 Download Case Study Overview Existing Structure & Location: Hangar 5 & PL7 Buildings were industrial buildings, originally constructed to provide an...
Shredded Wheat Factory
Client : Plutus EstatesProgramme : 32 weeksValue : £1.5m Download Case StudyLOCATION & OVERVIEW The project consisted of 33 acres split over 2 sites. The North site contained the former 1920’s Shredded Wheat Factory of which the original factory and...
Project Jefferson
Client : J F FinneganProgramme : 11 weeksValue : £230k Download Case Study OVERVIEW The overall scheme at Block 90, Alderley Park was to soft strip and carry out the internal demolition of an existing 5 storey office block, in order to facilitate a full...
Get in Touch
John F Hunt Group - London Road, Grays, Essex, RM20 4DB
Tel: +44 (0)1375 366 700
Email: John F Hunt Info
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.