by hadimarashy | Mar 9, 2022 | Case Studies, Industrial
by hadimarashy | Sep 27, 2020 | Case Studies, Industrial
Client : Babcock / Defence Estates Programme : 15 weeks Value : £250k Download Case Study OVERVIEW A Second World War Lancaster bomber hangar measuring 100m long by 50m wide & 15m high, scheduled for demolition to make way for the development of a new flight...
by hadimarashy | Sep 27, 2020 | Case Studies, Industrial
Client : BAA / Taylor Woodrow Value : £1.8m Download Case Study Overview The existing canopy roof construction was 50mm thick paving slabs with high density foam insulation, mastic asphalt waterproofing and concrete Holorib type slab. Scope of Works As part of the...
by hadimarashy | Sep 26, 2020 | Case Studies, Industrial
Client : Costain Skanska JV Programme : 38 weeks Value : Confidential Download Case Study OVERVIEW HS2 is building a new high speed railway to link people across Britain, with over 25 stations connecting 30 million people and is one of the most demanding and exciting...
by hadimarashy | Sep 25, 2020 | Case Studies, Industrial
Client : BAA Gatwick / Taylor Woodrow Programme : 18 weeks Value : £250,000 Download Case Study Overview Existing Structure & Location: Hangar 5 & PL7 Buildings were industrial buildings, originally constructed to provide an aircraft hangar, maintenance...
by hadimarashy | Sep 24, 2020 | Case Studies, Industrial
Client : Plutus Estates Programme : 32 weeks Value : £1.5m Download Case Study LOCATION & OVERVIEW The project consisted of 33 acres split over 2 sites. The North site contained the former 1920’s Shredded Wheat Factory of which the original factory and silos were...