Hampstead Road
Client:
Costain Skanska JV on behalf of HS2
Programme:
10 weeks
Value:
£187k
Project Overview
The remove of identified asbestos before the demolition of a 5-storey building in Camden. This was a technically challenging project as the existing mechanical equipment had been left in-situ. This required numerous enclosures to be built at various levels, ensuring the seamless removal of Asbestos Insulation Board, which was used as fire protection throughout the entire run of an industrial conveyer system. Due to the complexities, air monitoring attendance was required three days every week.