Hampstead Road

Client : Costain Skanska Joint Venture
Programme : 10 weeks
Value : £187k


Stanford-le-Hope

OVERVIEW

The remove of identified asbestos before the demolition of a 5-storey building in Camden.

This was a technically challenging project as the existing mechanical equipment had been left in-situ. This required numerous enclosures to be built at various levels, ensuring the seamless removal of Asbestos Insulation Board, which was used as fire protection throughout the entire run of an industrial conveyer system.

Due to the complexities, air monitoring attendance was required three days every week.