Tower Blocks
Industrial Dismantling
Blasting
Temporary Works
Case Studies
Awards & Accreditations
Policy Statements
Enquiry Form
Contact
Case Studies

Case Study 1 2 3 4 5 6 7 :: St James's Street, London SW1

The Job

3 & 5 storey 1960’s buildings within the prestigiuous central London area of Pall Mall. The site was two doors away from Clarence House, the former Queen Mothers residence, and directly joined to Mark Masons Hall, one of the most important Masonic Hall in the country.

The works

We were to demolish the three and five storey structures, remove a mansard roof on top of a Grade II listed building and strip out and remove the basement slab directly beneath the Grade II listed area. Extensive protection works were carried out within the building during the demolition to ensure that none of the listed areas were damaged in any way.

Environment

We invested in the innovative use of remote controlled machinery within the listed areas, which meant that environmental pollution was kept to an absolute minimum.

Delivery of Services

The demolition of the various structures was completed within the 18 week programme and within the £700,000 contract sum.


  Tel: 01375 366700 Fax: 01375 366800 Email: contracts@johnfhunt.co.uk 
  Site by Optix Solutions